4.15.26
Dear Property Owners,
4.16.25
Dear Bluffs West Estates POA members,
Due to changes in Xcel Energy's billing rates in 2025, the POA board will initiate the following changes in our watering schedule for the coming season. The mid-peak and on-peak hours are considerably higher than the off-peak hours. You can check the Xcel website for the times, and summer and winter rates for the new rate schedule. In a nutshell the Xcel rate structure is as follows:
Monday through Friday,
Off-peak: 7:00 pm to 1:00 pm (1900 hours to 1300 hours)...$0.07749/kwh. Please note, weekends from 7:00pm Friday until 1:00 pm on Monday would fall under the off-peak schedule.
Mid-peak: 1:00 pm to 3:00 pm (1300 hours to 1500 hours) ...$0.14332/kwh, Nearly double the off-peak rate
On-peak: 3:00 pm to 7:00 pm (1500 hours to 1900 hours)...$0.20915/kwh, Nearly three times the off-peak rate
The board feels that the mid-peak and on-peak hours rates would threaten the sustainability of our budget.
We have changed our watering schedule immediately to reflect all pump usage to fall within the off-peak times, thus our new schedule:
Monday - Friday 5:00 am to 11:00 am.
Also, a second shift on Monday - Friday from 7:00 pm to 11:00 pm.
Saturday and Sunday from 5:00 am to 11:00 pm.
This will provide folks with 10 hours of operating time daily for Bluffs West irrigation during the week and 18 hours of operation over the course of the weekend.
As we ready the system with pressure tests and checks for additional leaks, you can expect the water to be pressurized at any time between now and Saturday. Our hope is that we can be fully operational by Saturday, April 19th, 2025.
If you have a leak at your main, please notify Keith Williams (970-216-5387) or Doug Killerud (970-261-9435) immediately so we can shut the system down until the situation is rectified.
Thank you!
Kind regards,
Bluffs West Estates HOA Board/Pump Committee
10.8.24
10.2.24
6.7.24
All,
The watering schedule will be going back to the original schedule (see below) starting Monday Night (5-10-24) after approximately 6:45-7pm.
Weekdays – 5am to 10am again at 5pm to 10pm
Weekends – 5am to 10pm
Best regards to all,
Pump committee and Board
5.30.24
Good day all,
The water if you didn’t notice was on this morning.
We will start our normal hours of operation today:
Weekdays – 5am to 11am again at 5pm to 10pm
Weekends – 5am to 10pm
Again, we thank you for your patience during this waterless May.
Pump committee and Board
5.29.24
All,
We received the pump late this afternoon.
We have several things to prep on it.
The crane will be here Thursday morning at 7:30 to lift it out of the truck and hold it up until we connect it to the float.
Then we will continue to feed the wires to the control panel, hook it up, and test. We hope to have water to everyone by Thursday evening if all goes as planned.
Please stand by and thanks again for your understanding and patience!
Pump committee and Board
5.24.24
All,
The submersible pump shipped today; expected delivery is 3-5 days. Because of Memorial Day weekend, we not expecting it until Tuesday, the 28th.
Thanks again for all your patience and understanding!
Keith Williams
Pump Committee
5.16.24
Irrigation Update:
We are still on track to receive the new submersible pump by the end of May. We appreciate the patience many have expressed as we work on getting the irrigation system repaired. Since the outage of the submersible pump, we have pursued the idea of renting a pump as a temporary fix until the new submersible pump arrives. There were no submersible pumps available locally that matched up to our system requirements. We found a non-submersible pump that would work. However, the board made a cost/benefit decision, along with security concerns for the rental pump that would be placed on the pond bank and rejected the rental proposition. Much time and effort was expended by the volunteers on the Pump Committee chasing down these possible alternatives.
Another factor that limited our efforts was the tight financial condition of the HOA. Currently, we have adequate funds to purchase the new submersible pump and possibly meet our 2024 Budget. There are 18 home owners not current with their dues. The total amount of unpaid dues equals $5,222. Some homeowners have dues that are more than one year in arrears. The lack of funding limited the options we could pursue.
The recent rains have been very helpful in getting us through this waiting period for the new submersible pump.
5.2.24
Update…
The new submersible pump has been ordered. We expect to take delivery in 3-4 weeks. There is rain in the 10-day forecast and cooler temperatures than normal are forecast for May.
Pray for rain.
In the previous email it was identified that about 31% of the 2024 assessments ($7,300) have not been received. We will wait to see if Homeowners, who have yet to pay, bring their accounts up to date. Sometime in mid May, we will see where we stand and decide what if any special assessment may be needed to carry us through 2024.
If you have not paid your 2024 assessment, or in some cases 2024 and past due assessments, it is important that you do as soon as possible.
We appreciate the offers for help and your patience. As you pray for rain, include a prayer for the shipment of the pump and that it will arrive as planned or sooner.
Bluffs West HOA Board
4.29.24
All,
Today we learned the submersible pump that feeds the main pump in the pumphouse has a shorted motor and is not repairable.
We are working with Munro Pumps to get a replacement as soon as we can.
We ask for your patience and understanding. This pump was over 25 years old.
We will keep you all posted with updates.
Thanks!
Keith
Pump Committee
4.26.24
All,
The water is back on! Pressure maybe a bit low…with everyone trying to water and we still have some air in the system. It should improve as we continue to put a demand on it.
Thanks!
Keith
HOA Pump Committee
4.25.24
All,
We had to place a gasket on the new pump. The gasket sealant needs to cure for several hours. So, the water will come back on at approximately 8am tomorrow morning.
Thanks for your patience!
Keith
HOA Pump Committee
4.22.24
All,
We have water!
Thanks for your patience!
I will be unavailable tomorrow. Please call Doug Killerud for any assistance you may require:
970-261-9435
Keith
Bluffs West Pump Committee
4.19.24
All,
We have a break in El Rio Ct.
I will keep you all posted on the repair and when the water will be turned on.
Thank you!
Keith
Bluffs West Pump Committee
All,
We had to shut the pump down…we had a software error that we need the technician to investigate.
We don’t have an estimated time for fixing yet. Sorry for the delay. Will keep you posted.
Keith
4.18.24
All,
The pump is up and operational. You can start watering at 5pm this evening.
Schedule reminder:
M-F 5am to 10am and 5pm to 10pm
S&S 5am to 10pm
Thanks for your patience in getting the new pump/motor operating.
Bluffs West Pump Committee
4.17.24
Hello all,
We are reminding everyone to check their main valve and make sure it is closed. We are having trouble getting up to the desired GPM’s (380-400).
Thanks for your cooperation!
Pump Committee
All,
The pump part was installed, and we tried to bring the system up but there is a homeowner who is not currently home with a break and their main is not turned off. We will try to contact them after normal working hours and hopefully get the system fully charged this evening.
More to come!
Pump Committee
10.13.23
All,
Just checked with Redlands Water and Power…our water is scheduled to be shut off October 16th (Monday).
Thanks for your patience and help this last season! Except for one major break along the parkway, we’ve been fortunate and had a good year.
We will be pulling the pumps later this month for inspection. What we find will determine what our next step(s) will be.
If your neighbor hasn’t registered their email with us, please pass this information on.
Thank you very much!
4.26.23
I wanted to welcome new members to the Bluffs West email list…
Sarah Kieckhaefer and Rebecca Nichols.
All, just a friendly reminder of watering schedule (which could change depending on Xcel’s rates) and who to contact in case of irrigation issues…
5am to 10am and 5pm to 10pm Monday thru Friday
5am to 10pm Saturday & Sunday
Matt Casey 970-210-2922 mscasey125@yahoo.com
Doug Larson 970-241-3478 dlarson297@acsol.net
Don Lomax 970-640-4844 rlomax1207@gmail.com
Shawn Stratton 970-201-2315 s.stratton1969@icloud.com
Keith Williams 970-216-5387 kswilliams478@msn.com
If none of these are available, you can always contact our manager at Colwell Banker:
Barrett Miller 970-632-2776 bmiller@cbcprimeproperties.com
We hope you have an enjoyable summer and good watering.
Good day all!
The water is on!
The water schedule at this time will remain as last year…
5am to 10am and 5pm to 10pm M-F
5am to 10pm weekend
There could be a change in this schedule depending on what Xcel does with their rates.
Keith Williams
Herer are your contacts again for any water issues…
Matt Casey 970-210-2922 mscasey125@yahoo.com
Doug Larson 970-241-3478 dlarson297@acsol.net
Don Lomax 970-640-4844 rlomax1207@gmail.com
Shawn Stratton 970-201-2315 s.stratton1969@icloud.com
Keith Williams 970-216-5387 kswilliams478@msn.com
If none of these are available, you can always contact our manager at Colwell Banker:
All,
We have an update to when our water will be available for irrigating.
Please see below…
Thanks for your patience!
Keith Williams
(For Doug Killerud)
From: Redlands Water and Power Company
Update : The Water In date for 2023 has been re-set for Thursday, April 20, 2023 due to Weather & Emergency Repairs.
Thank you,
Marcy Mandros
Office Manager/Bookkeeper
2216 S. Broadway
Grand Junction, CO 81507
O: (970) 243-2173 Ext. 30
F: (970) 256-1320
CONTACT INFORMATION
POA Board
Matt Casey
Doug Killerud
Doug Larson
Marissa Marisay
Paul von Guerard
Additional contact for the Board, Coldwell Banker:
Barrett Miller Phone 970-632-2776 email: bmiller@cbcprimeproperties.com
Architectural Committee
Matt Casey
John Johnson
Keith Williams
Report covenant violations to Barrett Miller Phone 970-632-2776 email: bmiller@cbcprimeproperties.com
Contact the Architectural Committee for approval of building plans, color choices, and fence design and color.
Pump Committee
Doug Larson
Don Lomax
Matt Casey
Keith Williams Phone: 970-216-5387 email: kswilliams478@msn.com
Shawn Stratton
Additional contact for the Pump Committee to relay information only, Coldwell Banker:
Barrett Miller Phone 970-632-2776 email: bmiller@cbcprimeproperties.com
Hello again all,
We will again test the pump this coming Saturday (4-15-23) to make sure everything is working properly before we receive water from the canal on Monday (4-17-23).
Please make sure your main valve is shut. Also, please report as soon as possible if you witness any breaks in your irrigation lines.
Thanks again!
Keith Williams
(for Doug Killerud)
Here is Coldwell Bankers website so you can access all the Bluffs West documents, i.e., meeting minutes, architectural and landscaping forms, financials, covenants, etc.
https://www.gjhomes.com/bluffs-west-hoaBluffs West Home Owners Association
NOTICE
April 6, 2023
Greetings from the Board of the Bluffs West Home Owners Association!
This note is primarily for Homeowners living adjacent to the Greenbelt/Open space adjacent to and upstream from the irrigation pond.
In mid to late April into May 2023 the Mesa County Sheriff’s office Wildland Fire Crew will be performing fuels reduction in the Greenbelt upstream from the Irrigation Pond. This effort is to minimize fuel density and remove heavier and ladder fuels from the area to minimize the intensity and spread of potential wildfires in the Greenbelt. In addition, invasive species will be removed and stumps treated to inhibit regrowth.
This is the first phase of a multi-year project to reduce fuels and wildfire hazard in the open spaces of the Bluffs West HOA. The HOA is participating in this process under a Bureau of Land Management Fuels-Reduction Grant Program.
You may be contacted by Sheriff Department staff about aspects of the fuel removal adjacent to your property. Finally, if you have any questions about this project, please call Paul von Guerard at 970-201-8141
Thanks for your cooperation!Hello all!
Just a reminder to CLOSE your “Main Valves” before the water is released in the canal on 4-17-2023. We are going to do a pressure test on the system before this occurs.
Thanks for your cooperation!
Doug
4.29.22
Dear Bluffs West email group,
We have experienced two issues affecting the main line over the past 24 hours. Due to repairs yet to be completed, the water will be off until approximately 5 pm tomorrow. I will be in communication with the owner doing his repair and will power the system up tomorrow evening if the repair was successful. If not, we will try to isolate delivery to that portion of the neighborhood. It is an inexact system.
It was discovered that the timers needed to be reset and the daytime clock was not reading the correct day and time. They were set correctly this evening and triple checked for the following schedule:
M-F On: 5am to Off 10am and then On 5pm to Off 10pm
Sat-Sun On: 5am to Off 10pm
Please do not make any repairs on the main line or your main valve without contacting me first. For your safety, we must make sure that the main line is not under pressure. Our mainline pump can feed our system with a volume of more than 300 gallons per minute. That will fill your standard bathtub over 7 times in one minute at the pumphouse. Our timing system is usually reliable but to be sure you can make a safe repair, the system should be turned off manually.
Please note my cell number is 970-261-9435. A text is best during business hours.
Some of you may still have my disconnected landline in your phones.
Doug